Construction Quality Advisory

Independent oversight of construction delivery. Protecting your asset.

CQA verifies build quality on behalf of owners, developers and project delivery teams.

From a single site to a national portfolio our team ensures you can answer one question: are you getting what you paid for?

CQA delivers our services nationally.
Scope

Built for large scale development delivery

CQA is backed by Stonebank Group's development and project advisory practice. We understand what matters to asset owners long-term and deliver our services through that lens. Reimagining the Clerk of Works role for today's construction industry, we look beyond tick and flick QA systems and deliver targeted, meaningful improvements in asset performance.

$20M–$1B
Typical project value range, from single-building developments to major mixed use precincts
BTR sector
BTR
Residential sector
Residential
Seniors Living sector
Seniors Living
Health and Aged Care sector
Health and Aged Care
Mission Critical sector
Mission Critical
Education and Research sector
Education and Research
Commercial and Retail sector
Commercial and Retail
Industrial sector
Industrial
Why CQA

The gap on most project delivery teams

The builder

Delivering the works.

The design team

Protecting design intent.

The superintendent

Administering the contract.

The Gap: Independent Quality Assurance

Risk mitigation on modern construction projects is focused on shifting cost and design risk during delivery downstream to the builder and on the subcontractors. Consultants are often novated to the builder, leaving the project manager and superintendent to protect the Principal's interest, alongside limited inspections by the Building Surveyor. Whilst the builder is contractually responsible for build quality, there is no one independently verifying the quality of the workmanship.

Most major defects originate from construction execution rather than design intent. They are visible during construction, and preventable – if someone is looking. Early detection and rectification is the key to avoiding costly rectification.

This isn't a new problem, it's a role the industry lost. The Clerk of Works largely disappeared from Australian construction through the 1980s and 90s, as design-and-construct procurement reduced consultant site attendance and shifted certification to the contractor. The consequences are the ones the whole industry now knows by name: Opal Tower, the Lacrosse Building fire, Victoria's cladding rectification programme. Liability for what goes wrong increasingly sits with owners and developers, not away from them.

Why now

What a defect actually costs

A defect is rarely just a rectification bill. It reduces asset value, degrades the occupant experience and raises maintenance costs for the life of the building. Timing is the whole argument, the same defect found later costs disproportionately more to resolve.

When it's foundCost to rectify
During constructionBaseline
One year after completion96% to 1,764% more
Seven years after completionUp to 3,399% more

The cost of prevention is always outweighed by the cost of rectification.

The regulatory direction reinforces the commercial one. Government is progressively shifting defect liability onto owners and developers, not away from them, and Victoria's Building and Plumbing Commission is tendering a panel to deliver similar independent oversight on Class 2 buildings. Independent verification is moving from best practice to expected practice.

What we do

A continuum, not a single inspection

We can engage at any single point on this continuum, or across the full lifecycle. Each phase is equally impactful.

01

Brief

Defining the quality aspects of the brief that matter, via the PPR, specification and standard details.

02

Design review

Reviewing the evolving design against the quality brief, targeted at the areas that cause latent defects.

03

Construction inspections

Representing the owner on site, verifying workmanship, materials and sign offs against specification.

04

Completion

Managing commissioning and training to expedite the transition from development to operation.

05

Continual improvement

Reviewing defect trends and legislative change, feeding findings back into the next brief.

Our services

A single project, or a whole portfolio

For a single site, our services run project by project. For developers, operators and fund managers running a pipeline, they scale into a portfolio-wide quality function.

Clerk of Works

Regular, on-site quality inspection and audit through construction.

Design review

Reviewing design documentation for the issues that become future quality problems.

Investor representative

Periodic inspection and reporting aligned to an investor's or fund's own requirements.

At portfolio level, this becomes a standing function: a construction quality standard applied across every development, defect trend analysis that feeds back into the next brief, and consistent oversight regardless of which site or which builder.

Where defects hide

Where we look

We inspect what is hardest to fix later rather than what is easiest to see.

Basement construction

Retention, shoring and water control.

Structure

Concrete, steel and timber.

Façade

Cladding, glazing and building envelopes.

Terraces & roofs

Roof systems, membranes and drainage.

Passive fire systems

Fire rating and compartmentation.

Acoustics

Insulation and sound transmission.

Waterproofing

Membranes and wet-area detailing.

Services

Mechanical, electrical and hydraulics.

How the role works

How the role sits on your project

What the role does not do

It will not modify the design, instruct the contractor on methods of working, issue instructions to the contractor, vary contract procedures, or commit costs. That clarity is what allows it to work alongside a capable builder rather than against them.

Proof

What it delivers

This isn't a one-project claim. It's now a standard offering applied across a growing, multi-sector portfolio.

1,500+
Apartments inspected
$1bn+
Construction value of works inspected
1,000+
Quality issues identified and resolved before completion
Case study

103 apartment retirement living development

Engaged as Clerk of Works from inception. 530 quality issues identified and resolved during construction. Zero latent defects at handover.

Quality issues identified included:

  • Retention wall drainage
  • Installation of floor wastes to external drainage
  • Reinforcement placing and cover

The engagement cost a fraction of the rectification of any major issue identified and prevented.

Case study

Build to rent development

Engaged on a limited Clerk of Works scope, joining mid-construction. Regular inspections, spot-checked QA records, and design detail review.

Identified for rectification, including:

  • Balcony waterproofing
  • Fire wall construction
  • Overflow levels and sufficiency

Proof that a targeted, mid-construction scope still catches what matters.

"It filled an obvious gap in the meticulous approach we had taken to every other aspect of the project. We would not hesitate to engage the team on our future projects, or recommend them to other owners and operators."

Chief Retirement Living Officer
Owner, retirement living development

"They bring clarity and structure to complexity, anchoring every stage of delivery in value, accountability and long term operational performance."

Chief Executive Officer
Owner, retirement living development

"The team was able to integrate with ours, collaboratively working to exceed benchmarks. We would welcome the opportunity to work with the team on our future projects."

Project Director
Builder, same development

The builder has since embedded a similar internal process across its own future projects, the clearest evidence the role works with a builder, not against one.

Our Team

Skilled technical professionals

Engagements are led by directors and senior construction professionals, with decades of combined construction and design experience. This is a technical oversight function, not an entry-level compliance role, and it's resourced accordingly.

Chris Adams, Director at Stonebank Group

Chris Adams

Director

Leads Construction Quality Advisory.

Ross Saunders, Technical Director - Construction at Stonebank Group

Ross Saunders

Technical Director — Construction

Brings deep construction and technical oversight to Stonebank's Construction Quality Advisory practice.

Livee Tan, Senior Project Manager at Stonebank Group

Livee Tan

Senior Project Manager

Leads development projects from early feasibility and briefing through approvals and delivery, helping clients balance commercial objectives, project risk and delivery requirements.

Systems

Systems and accreditation

We integrate with the builder's defect systems allowing us to notify most issues in real-time.

Underpinned by:

ISO 9001
ISO 14001
ISO 45001

CQA is the dedicated Construction Quality Advisory practice of Stonebank Group, a director led property development advisory firm engaged nationally on projects across Australia.